Brighton Roofing Codes: Permits, Inspections, and Requirements
Adopted building and energy codes, permit rules, and roofing requirements for Brighton, Adams County. Rows below reflect our reading of the jurisdiction's own published sources, linked at the bottom of the page.
Building department
303-655-2017Inspection line
303-655-2151Permit line
303-655-2017Official department
Live code pageBrighton roofing code requirements
- What this jurisdiction requires
- 2021 IBC and 2021 IRC
- What this jurisdiction requires
- 2021 IECC
- What this jurisdiction requires
- Yes
- What this jurisdiction requires
- 110 MPH sustained, with a manufacturer wind warranty required
- What this jurisdiction requires
- Not required for standard asphalt shingle reroofs. Required on flat commercial roofs, tile roofs, and any job where decking is replaced
- What this jurisdiction requires
- One layer. New roof coverings cannot go on without removing the existing covering, so a full tear-off is required
- What this jurisdiction requires
- Not required by the city. Install it only where the shingle manufacturer requires it
- What this jurisdiction requires
- Three tab shingles are not allowed on habitable structures
| Requirement | What this jurisdiction requires |
|---|---|
| Current building code | 2021 IBC and 2021 IRC |
| Current energy code | 2021 IECC |
| Building permit required | Yes |
| Minimum wind speed rating for asphalt shingles | 110 MPH sustained, with a manufacturer wind warranty required |
| Requires midroof (in progress) inspection | Not required for standard asphalt shingle reroofs. Required on flat commercial roofs, tile roofs, and any job where decking is replaced |
| Maximum layers of asphalt shingles permitted | One layer. New roof coverings cannot go on without removing the existing covering, so a full tear-off is required |
| Self adhering underlayment (ice and water shield) | Not required by the city. Install it only where the shingle manufacturer requires it |
| Special conditions | Three tab shingles are not allowed on habitable structures |
Last checked September 2, 2026. This reflects published sources at that date, not an official ruling. Code adoptions change, so confirm with the Brighton building department before you pull a permit.
What Brighton requires, in plain language
Brighton builds to the 2021 IBC and 2021 IRC. That edition, not the newest code published nationally, is the rulebook an inspector in Adams County holds your roof to. Energy work on the same permit follows the 2021 IECC.
Layer limit in Brighton: One layer. New roof coverings cannot go on without removing the existing covering, so a full tear-off is required. This is the line item that moves a bid the most. If your existing roof is already at the limit, the deck gets stripped before new material goes down, and the labor plus dump fees belong in the written price.
Wind is what Brighton tests shingles against. Shingles need a 110 MPH sustained, with a manufacturer wind warranty required rating.
Underlayment and edge metal are where roofs fail inspection. Ice and water shield: Not required by the city. Install it only where the shingle manufacturer requires it.
Brighton amended Municipal Code Chapter 15 to adopt the 2021 editions of the International Building, Residential, Energy Conservation, Fire, Fuel Gas, Mechanical, Plumbing and Property Maintenance Codes by reference.

Sources
These links go straight to the jurisdiction, so you always have the real-time source. Adoptions and amendments change on their schedule, not ours. Always confirm before permitting.
Keep going
Nearby jurisdictions
Last checked September 2, 2026. This is our best read of published sources, not an official ruling. Confirm with the Brighton building department before you pull a permit.