
Park County Roofing Codes: Permits, Inspections, and Requirements
Adopted building and energy codes, permit rules, and roofing requirements for Park County, Park County. Rows below reflect our reading of the jurisdiction's own published sources, linked at the bottom of the page.
Park County roofing code requirements
- What this jurisdiction requires
- 2018 IBC and 2018 IRC with county revisions and exemptions
- What this jurisdiction requires
- Yes
- What this jurisdiction requires
- Class A required in wildland urban interface areas
- What this jurisdiction requires
- Class A
- What this jurisdiction requires
- Class A
- What this jurisdiction requires
- Yes
- What this jurisdiction requires
- No
- What this jurisdiction requires
- Yes, at 100% underlayment (no shingles)
- What this jurisdiction requires
- No
- What this jurisdiction requires
- One layer
- What this jurisdiction requires
- One layer
- What this jurisdiction requires
- Yes
- What this jurisdiction requires
- 3/16
- What this jurisdiction requires
- Yes
- What this jurisdiction requires
- Per Code
- What this jurisdiction requires
- Yes
- What this jurisdiction requires
- Yes
- What this jurisdiction requires
- Per Code
- What this jurisdiction requires
- No
- What this jurisdiction requires
- Both
- What this jurisdiction requires
- Either
- What this jurisdiction requires
- Either
- What this jurisdiction requires
- 30" or greater width
- What this jurisdiction requires
- Yes
- What this jurisdiction requires
- Yes
- What this jurisdiction requires
- Yes
| Requirement | What this jurisdiction requires |
|---|---|
| Current building code | 2018 IBC and 2018 IRC with county revisions and exemptions |
| Building permit required | Yes |
| Roof system fire rating (residential) | Class A required in wildland urban interface areas |
| Roof system fire rating (commercial) | Class A |
| Roof system fire rating (multi-family) | Class A |
| Requires wind nailing | Yes |
| Inspectors carry ladders for the final | No |
| Requires midroof (in progress) inspection | Yes, at 100% underlayment (no shingles) |
| Requires a sheathing / decking inspection | No |
| Maximum layers of asphalt shingles permitted | One layer |
| Maximum layers of flat roof material permitted | One layer |
| Requires solid sheeting over spaced decking | Yes |
| Sheeting gap requirement | 3/16 |
| Requires drip edge | Yes |
| Minimum drip edge size | Per Code |
| Requires rake / gable metal edging | Yes |
| Self adhering underlayment (ice and water shield) | Yes |
| Underlayment required 4:12 and above | Per Code |
| Rolled roofing allowed on low slope over living space | No |
| Type of valleys allowed | Both |
| Valley material required for closed valleys | Either |
| Valley material required for open valleys | Either |
| Chimney cricket requirement | 30" or greater width |
| Requires ridge cap | Yes |
| Requires ventilation to meet code | Yes |
| Requires soffit / eave vents | Yes |
Last checked September 2, 2026. This reflects published sources at that date, not an official ruling. Code adoptions change, so confirm with the Park County building department before you pull a permit.
What Park County requires, in plain language
Park County builds to the 2018 IBC and 2018 IRC with county revisions and exemptions. That edition, not the newest code published nationally, is the rulebook an inspector in Park County holds your roof to.
Layer limit in Park County: One layer. This is the line item that moves a bid the most. If your existing roof is already at the limit, the deck gets stripped before new material goes down, and the labor plus dump fees belong in the written price. Flat roof sections are capped at One layer.
Wind is what Park County tests shingles against. Wind nailing: Yes.
Underlayment and edge metal are where roofs fail inspection. Ice and water shield: Yes. On 4:12 and steeper: Per Code. Drip edge: Yes. Minimum drip edge size Per Code.
Park County adopted the 2018 building code by resolution with county revisions and exemptions. Confirm with development services whether a newer edition has been adopted before you rely on the 2018 provisions.
Installation details above come from our building department field survey for Park County, last updated 1/3/19. Code editions and contacts are refreshed from the department directly. Always confirm the details on your permit before work starts, since departments amend requirements on their own schedule.

Sources
These links go straight to the jurisdiction, so you always have the real-time source. Adoptions and amendments change on their schedule, not ours. Always confirm before permitting.
Last checked September 2, 2026. This is our best read of published sources, not an official ruling. Confirm with the Park County building department before you pull a permit.
