
Parker Roofing Codes: Permits, Inspections, and Requirements
Adopted building and energy codes, permit rules, and roofing requirements for Parker, Douglas County. Rows below reflect our reading of the jurisdiction's own published sources, linked at the bottom of the page.
Building department
303-841-1970Inspection line
303-805-3160Permit line
303-840-8592Official department
Live code pageParker roofing code requirements
- What this jurisdiction requires
- 2024 IBC and 2024 IRC with the 2024 Parker Administrative Code
- What this jurisdiction requires
- Yes
- What this jurisdiction requires
- Gutters & siding
- What this jurisdiction requires
- SFD - 115 MPH (90 MPH, 3 second gusts, exposure C): Commercial - please contact
- What this jurisdiction requires
- ASTM D 7158 or ASTMD 3161
- What this jurisdiction requires
- Yes, 6 nails per shingle
- What this jurisdiction requires
- Yes, schedule mid-roof day before tear off begins
- What this jurisdiction requires
- Yes, if replacing with new sheathing
- What this jurisdiction requires
- One layer
- What this jurisdiction requires
- One layer
- What this jurisdiction requires
- Yes
- What this jurisdiction requires
- ¼ inch gap
- What this jurisdiction requires
- Yes
- What this jurisdiction requires
- 2×2 minimum or large enough to cover any gaps from original construction
- What this jurisdiction requires
- Yes
- What this jurisdiction requires
- No
- What this jurisdiction requires
- 19" overlap of 15#
- What this jurisdiction requires
- 15# manufacture requirements may be more stringent check requirements
- What this jurisdiction requires
- No, non heated space only
- What this jurisdiction requires
- Both
- What this jurisdiction requires
- Either - per manufacture minimum ASTM D 6380 or 1970
- What this jurisdiction requires
- Per Manufacture, minimum ASTM D 3909 or 6380 Class M
- What this jurisdiction requires
- Yes
- What this jurisdiction requires
- 30" or greater width - please call for site-specific questions
- What this jurisdiction requires
- Yes - 4×4
- What this jurisdiction requires
- Yes
- What this jurisdiction requires
- Yes
- What this jurisdiction requires
- Please contact us about the Roof Class Systems
| Requirement | What this jurisdiction requires |
|---|---|
| Current building code | 2024 IBC and 2024 IRC with the 2024 Parker Administrative Code |
| Building permit required | Yes |
| Other or special permits required | Gutters & siding |
| Minimum wind speed rating for asphalt shingles | SFD - 115 MPH (90 MPH, 3 second gusts, exposure C): Commercial - please contact |
| ASTM standard for wind rating | ASTM D 7158 or ASTMD 3161 |
| Requires wind nailing | Yes, 6 nails per shingle |
| Requires midroof (in progress) inspection | Yes, schedule mid-roof day before tear off begins |
| Requires a sheathing / decking inspection | Yes, if replacing with new sheathing |
| Maximum layers of asphalt shingles permitted | One layer |
| Maximum layers of flat roof material permitted | One layer |
| Requires solid sheeting over spaced decking | Yes |
| Sheeting gap requirement | ¼ inch gap |
| Requires drip edge | Yes |
| Minimum drip edge size | 2×2 minimum or large enough to cover any gaps from original construction |
| Requires rake / gable metal edging | Yes |
| Self adhering underlayment (ice and water shield) | No |
| Underlayment required 2:12 up to 4:12 | 19" overlap of 15# |
| Underlayment required 4:12 and above | 15# manufacture requirements may be more stringent check requirements |
| Rolled roofing allowed on low slope over living space | No, non heated space only |
| Type of valleys allowed | Both |
| Valley material required for closed valleys | Either - per manufacture minimum ASTM D 6380 or 1970 |
| Valley material required for open valleys | Per Manufacture, minimum ASTM D 3909 or 6380 Class M |
| Kick-out required on step flashing | Yes |
| Chimney cricket requirement | 30" or greater width - please call for site-specific questions |
| Minimum curb height requirement | Yes - 4×4 |
| Requires ridge cap | Yes |
| Requires ventilation to meet code | Yes |
| Special conditions | Please contact us about the Roof Class Systems |
Last checked September 2, 2026. This reflects published sources at that date, not an official ruling. Code adoptions change, so confirm with the Parker building department before you pull a permit.
What Parker requires, in plain language
Parker builds to the 2024 IBC and 2024 IRC with the 2024 Parker Administrative Code. That edition, not the newest code published nationally, is the rulebook an inspector in Douglas County holds your roof to.
Layer limit in Parker: One layer. This is the line item that moves a bid the most. If your existing roof is already at the limit, the deck gets stripped before new material goes down, and the labor plus dump fees belong in the written price. Flat roof sections are capped at One layer.
Wind is what Parker tests shingles against. Shingles need a SFD - 115 MPH (90 MPH, 3 second gusts, exposure C): Commercial - please contact rating. Rating is proven under ASTM D 7158 or ASTMD 3161. Wind nailing: Yes, 6 nails per shingle.
Underlayment and edge metal are where roofs fail inspection. Ice and water shield: No. On 2:12 to 4:12 slopes: 19" overlap of 15#. On 4:12 and steeper: 15# manufacture requirements may be more stringent check requirements. Drip edge: Yes. Minimum drip edge size 2×2 minimum or large enough to cover any gaps from original construction.
Parker Town Council approved the 2024 International Building Codes with an effective date of June 30, 2026, along with a 2024 Parker Administrative Code.
Installation details above come from our building department field survey for Parker, last updated 11/27/18. Code editions and contacts are refreshed from the department directly. Always confirm the details on your permit before work starts, since departments amend requirements on their own schedule.

Sources
These links go straight to the jurisdiction, so you always have the real-time source. Adoptions and amendments change on their schedule, not ours. Always confirm before permitting.
Last checked September 2, 2026. This is our best read of published sources, not an official ruling. Confirm with the Parker building department before you pull a permit.
