
Wheat Ridge Roofing Codes: Permits, Inspections, and Requirements
Adopted building and energy codes, permit rules, and roofing requirements for Wheat Ridge, Jefferson County. Rows below reflect our reading of the jurisdiction's own published sources, linked at the bottom of the page.
Building department
303-235-2855Inspection line
303-235-2855Permit line
303-235-2855Official department
Live code pageWheat Ridge roofing code requirements
- What this jurisdiction requires
- 2024 IBC and 2024 IRC
- What this jurisdiction requires
- Yes
- What this jurisdiction requires
- Decking permit included in roofing permit
- What this jurisdiction requires
- Class C
- What this jurisdiction requires
- Class A
- What this jurisdiction requires
- Class A
- What this jurisdiction requires
- 105 Exposure C 3 second gust
- What this jurisdiction requires
- D3161 Class F - 3 tabs meeting this requirement are acceptable
- What this jurisdiction requires
- No
- What this jurisdiction requires
- Yes - 6 nails per shingle
- What this jurisdiction requires
- Yes - call for mid-roof when 25% minimum and 75% maximum complete. Roofs completed beyond 75% at mid-roof are subject to removal of roofing for mid-roof inspection.
- What this jurisdiction requires
- Yes
- What this jurisdiction requires
- One layer - any tear off requires removal of all coverings to deck
- What this jurisdiction requires
- One layer - any tear off requires removal of all coverings to deck
- What this jurisdiction requires
- Yes
- What this jurisdiction requires
- ½ inch gap - any gap anywhere in the sheathing which exceeds ½ inch requires overlay - minimum 3/8 inch OSB sheathing
- What this jurisdiction requires
- Yes
- What this jurisdiction requires
- 2 x 2
- What this jurisdiction requires
- No
- What this jurisdiction requires
- Yes
- What this jurisdiction requires
- 19 inch overlap of 15#
- What this jurisdiction requires
- 15#
- What this jurisdiction requires
- Yes - must follow manufacturers specifications for product or double coverage is required
- What this jurisdiction requires
- Both - see IRC R905.2.8.2
- What this jurisdiction requires
- Ice and water - see IRC R905.2.8.2
- What this jurisdiction requires
- Ice and water under metal - see IRC R905.2.8.2
- What this jurisdiction requires
- Yes
- What this jurisdiction requires
- Per IRC R903.2.2 - any roof structure or appendage greater than 30 inches in width
- What this jurisdiction requires
- Yes
- What this jurisdiction requires
- Yes - ¼ inch per food
- What this jurisdiction requires
- Yes
- What this jurisdiction requires
- Yes
| Requirement | What this jurisdiction requires |
|---|---|
| Current building code | 2024 IBC and 2024 IRC |
| Building permit required | Yes |
| Other or special permits required | Decking permit included in roofing permit |
| Roof system fire rating (residential) | Class C |
| Roof system fire rating (commercial) | Class A |
| Roof system fire rating (multi-family) | Class A |
| Minimum wind speed rating for asphalt shingles | 105 Exposure C 3 second gust |
| ASTM standard for wind rating | D3161 Class F - 3 tabs meeting this requirement are acceptable |
| Requires a manufacturer wind warranty | No |
| Requires wind nailing | Yes - 6 nails per shingle |
| Requires midroof (in progress) inspection | Yes - call for mid-roof when 25% minimum and 75% maximum complete. Roofs completed beyond 75% at mid-roof are subject to removal of roofing for mid-roof inspection. |
| Requires a sheathing / decking inspection | Yes |
| Maximum layers of asphalt shingles permitted | One layer - any tear off requires removal of all coverings to deck |
| Maximum layers of flat roof material permitted | One layer - any tear off requires removal of all coverings to deck |
| Requires solid sheeting over spaced decking | Yes |
| Sheeting gap requirement | ½ inch gap - any gap anywhere in the sheathing which exceeds ½ inch requires overlay - minimum 3/8 inch OSB sheathing |
| Requires drip edge | Yes |
| Minimum drip edge size | 2 x 2 |
| Requires rake / gable metal edging | No |
| Self adhering underlayment (ice and water shield) | Yes |
| Underlayment required 2:12 up to 4:12 | 19 inch overlap of 15# |
| Underlayment required 4:12 and above | 15# |
| Rolled roofing allowed on low slope over living space | Yes - must follow manufacturers specifications for product or double coverage is required |
| Type of valleys allowed | Both - see IRC R905.2.8.2 |
| Valley material required for closed valleys | Ice and water - see IRC R905.2.8.2 |
| Valley material required for open valleys | Ice and water under metal - see IRC R905.2.8.2 |
| Kick-out required on step flashing | Yes |
| Chimney cricket requirement | Per IRC R903.2.2 - any roof structure or appendage greater than 30 inches in width |
| Minimum curb height requirement | Yes |
| Requires positive drainage | Yes - ¼ inch per food |
| Requires ventilation to meet code | Yes |
| Requires soffit / eave vents | Yes |
Last checked September 2, 2026. This reflects published sources at that date, not an official ruling. Code adoptions change, so confirm with the Wheat Ridge building department before you pull a permit.
What Wheat Ridge requires, in plain language
Wheat Ridge builds to the 2024 IBC and 2024 IRC. That edition, not the newest code published nationally, is the rulebook an inspector in Jefferson County holds your roof to.
Layer limit in Wheat Ridge: One layer - any tear off requires removal of all coverings to deck. This is the line item that moves a bid the most. If your existing roof is already at the limit, the deck gets stripped before new material goes down, and the labor plus dump fees belong in the written price. Flat roof sections are capped at One layer - any tear off requires removal of all coverings to deck.
Wind is what Wheat Ridge tests shingles against. Shingles need a 105 Exposure C 3 second gust rating. Rating is proven under D3161 Class F - 3 tabs meeting this requirement are acceptable. Wind nailing: Yes - 6 nails per shingle. Manufacturer wind warranty: No.
Underlayment and edge metal are where roofs fail inspection. Ice and water shield: Yes. On 2:12 to 4:12 slopes: 19 inch overlap of 15#. On 4:12 and steeper: 15#. Drip edge: Yes. Minimum drip edge size 2 x 2.
Wheat Ridge adopted the 2024 International Codes, mandatory for all permit applications submitted on or after January 1, 2026.
Installation details above come from our building department field survey for Wheat Ridge, last updated 1/6/2019. Code editions and contacts are refreshed from the department directly. Always confirm the details on your permit before work starts, since departments amend requirements on their own schedule.

Sources
- https://www.wheatridge.gov/278/Building-Division
- https://www.wheatridge.gov/280/Adopted-Codes-Amendments
These links go straight to the jurisdiction, so you always have the real-time source. Adoptions and amendments change on their schedule, not ours. Always confirm before permitting.
Last checked September 2, 2026. This is our best read of published sources, not an official ruling. Confirm with the Wheat Ridge building department before you pull a permit.
