
Aurora Roofing Codes: Permits, Inspections, and Requirements
Adopted building and energy codes, permit rules, and roofing requirements for Aurora, Arapahoe, Adams and Douglas Counties. Rows below reflect our reading of the jurisdiction's own published sources, linked at the bottom of the page.
Building department
303-739-7420Inspection line
303-739-7420Permit line
303-739-7420Official department
Live code pageAurora roofing code requirements
- What this jurisdiction requires
- 2021 IBC and 2021 IRC
- What this jurisdiction requires
- 2021 IECC
- What this jurisdiction requires
- Yes
- What this jurisdiction requires
- Class A
- What this jurisdiction requires
- 105 to 120 MPH three second gust depending on Risk Category and Exposure under the IRC and IBC
- What this jurisdiction requires
- One layer
- What this jurisdiction requires
- Required
- What this jurisdiction requires
- Required
- What this jurisdiction requires
- Ice barrier required at eaves per the IRC
- What this jurisdiction requires
- Two layers of underlayment
- What this jurisdiction requires
- One layer of underlayment
- What this jurisdiction requires
- Required where the roof meets a wall
- What this jurisdiction requires
- Required, installed to manufacturer specifications
- What this jurisdiction requires
- Required on new construction under the 2021 IECC
- What this jurisdiction requires
- Required per IRC attic ventilation provisions
| Requirement | What this jurisdiction requires |
|---|---|
| Current building code | 2021 IBC and 2021 IRC |
| Current energy code | 2021 IECC |
| Building permit required | Yes |
| Roof system fire rating (residential) | Class A |
| Minimum wind speed rating for asphalt shingles | 105 to 120 MPH three second gust depending on Risk Category and Exposure under the IRC and IBC |
| Maximum layers of asphalt shingles permitted | One layer |
| Requires drip edge | Required |
| Requires rake / gable metal edging | Required |
| Self adhering underlayment (ice and water shield) | Ice barrier required at eaves per the IRC |
| Underlayment required 2:12 up to 4:12 | Two layers of underlayment |
| Underlayment required 4:12 and above | One layer of underlayment |
| Kick-out required on step flashing | Required where the roof meets a wall |
| Requires ridge cap | Required, installed to manufacturer specifications |
| Blower door test when increasing ventilation to code | Required on new construction under the 2021 IECC |
| Requires soffit / eave vents | Required per IRC attic ventilation provisions |
Last checked September 2, 2026. This reflects published sources at that date, not an official ruling. Code adoptions change, so confirm with the Aurora building department before you pull a permit.
What Aurora requires, in plain language
Aurora builds to the 2021 IBC and 2021 IRC. That edition, not the newest code published nationally, is the rulebook an inspector in Arapahoe, Adams and Douglas Counties holds your roof to. Energy work on the same permit follows the 2021 IECC.
Layer limit in Aurora: One layer. This is the line item that moves a bid the most. If your existing roof is already at the limit, the deck gets stripped before new material goes down, and the labor plus dump fees belong in the written price.
Wind is what Aurora tests shingles against. Shingles need a 105 to 120 MPH three second gust depending on Risk Category and Exposure under the IRC and IBC rating.
Underlayment and edge metal are where roofs fail inspection. Ice and water shield: Ice barrier required at eaves per the IRC. On 2:12 to 4:12 slopes: Two layers of underlayment. On 4:12 and steeper: One layer of underlayment. Drip edge: Required.
Aurora has adopted the 2021 family of International Codes, including the IBC, IRC, IMC, IPC, IFGC, IECC, IEBC and IFC, along with the 2023 NEC.

Sources
- https://www.auroragov.org/business_services/building_division
- https://www.auroragov.org/business_services/building_division/adopted_codes
These links go straight to the jurisdiction, so you always have the real-time source. Adoptions and amendments change on their schedule, not ours. Always confirm before permitting.
Last checked September 2, 2026. This is our best read of published sources, not an official ruling. Confirm with the Aurora building department before you pull a permit.
