Lakewood roofing code requirements

Lakewood roofing code reference
Current building code
What this jurisdiction requires
2021 IBC and 2021 IRC
Current energy code
What this jurisdiction requires
2021 IECC
Building permit required
What this jurisdiction requires
Yes
Roof system fire rating (residential)
What this jurisdiction requires
Class A
Minimum wind speed rating for asphalt shingles
What this jurisdiction requires
100 MPH sustained/120 MPH 3 second gusts
Inspectors carry ladders for the final
What this jurisdiction requires
A safe ladder secured to the roof must be provided to all roof inspections where the eave line is greater than 10' above the ground.
Requires midroof (in progress) inspection
What this jurisdiction requires
Yes, for tile or metal roof systems after felt, flashing, and battens are installed but before final roof covering is installed.
Maximum layers of asphalt shingles permitted
What this jurisdiction requires
One layer
Maximum layers of flat roof material permitted
What this jurisdiction requires
Single layer only permitted
Requires drip edge
What this jurisdiction requires
Required
Minimum drip edge size
What this jurisdiction requires
2 x 2, 2 inches on deck and ¼ inch below decking
Requires rake / gable metal edging
What this jurisdiction requires
Required
Self adhering underlayment (ice and water shield)
What this jurisdiction requires
Ice barrier required at eaves per the IRC
Underlayment required 2:12 up to 4:12
What this jurisdiction requires
Two layers of underlayment
Underlayment required 4:12 and above
What this jurisdiction requires
One layer of underlayment
Type of valleys allowed
What this jurisdiction requires
Both
Valley material required for closed valleys
What this jurisdiction requires
Either
Valley material required for open valleys
What this jurisdiction requires
Either
Kick-out required on step flashing
What this jurisdiction requires
Required where the roof meets a wall
Requires ridge cap
What this jurisdiction requires
Required, installed to manufacturer specifications
Requires ventilation to meet code
What this jurisdiction requires
Yes
Blower door test when increasing ventilation to code
What this jurisdiction requires
Required on new construction under the 2021 IECC
Requires soffit / eave vents
What this jurisdiction requires
Required per IRC attic ventilation provisions

Last checked September 2, 2026. This reflects published sources at that date, not an official ruling. Code adoptions change, so confirm with the Lakewood building department before you pull a permit.

What Lakewood requires, in plain language

Lakewood builds to the 2021 IBC and 2021 IRC. That edition, not the newest code published nationally, is the rulebook an inspector in Jefferson County holds your roof to. Energy work on the same permit follows the 2021 IECC.

Layer limit in Lakewood: One layer. This is the line item that moves a bid the most. If your existing roof is already at the limit, the deck gets stripped before new material goes down, and the labor plus dump fees belong in the written price. Flat roof sections are capped at Single layer only permitted.

Wind is what Lakewood tests shingles against. Shingles need a 100 MPH sustained/120 MPH 3 second gusts rating.

Underlayment and edge metal are where roofs fail inspection. Ice and water shield: Ice barrier required at eaves per the IRC. On 2:12 to 4:12 slopes: Two layers of underlayment. On 4:12 and steeper: One layer of underlayment. Drip edge: Required. Minimum drip edge size 2 x 2, 2 inches on deck and ¼ inch below decking.

Lakewood City Council adopted the 2021 IBC, IRC, IPC, IMC, IFGC, IECC, IEBC, IFC and ISPSC along with the 2023 NEC in 2023.

Installation details above come from our building department field survey for Lakewood, last updated 8/22/18. Code editions and contacts are refreshed from the department directly. Always confirm the details on your permit before work starts, since departments amend requirements on their own schedule.

Code compliant roof installation near Lakewood, Colorado

Sources

These links go straight to the jurisdiction, so you always have the real-time source. Adoptions and amendments change on their schedule, not ours. Always confirm before permitting.

Last checked September 2, 2026. This is our best read of published sources, not an official ruling. Confirm with the Lakewood building department before you pull a permit.

Free inspection, same day answers

Call Now